πŸ› οΈ TDF Roadmap

Traditional Dream Factory is operating as a DAO, organized in a sociocratic manner with circles for each of our core areas of focus: permaculture, architecture & construction, legal & tokenization, community and coordination.

We are currently focused on developing the coliving concept repurposing the existing buildings on the land. Along with building accomodations for humans, we are also building water systems (natural pool, grey water treatment etc), reforesting & creating food systems, developing a legal and technological framework for regenerative villages that can be replicated, creating art, brewing kombucha, hosting events... Life is rich, and the container we are building is here to encourage your creativity and to give you the tools to bring your gifts to the world.

Over last winter we planted about 1800 trees, reforesting some of the uncovered land as well as starting our food forest which we are expanding this winter (2022). We planted ~1000 trees from seed in the fall that we will be adding to our forest to enhance it's biodiversity and create a wholistic food production system that can sustain life.

TDF Area map
Traditional Dream Factory area map. Purple is the land we own (coliving), yellow is the 5ha currently leased that we are regenerating, and yellow+green is the 25ha option to buy (it has a small farm, old windmill, a river, multiple agricultural dependencies, and includes 4000 sqm urbanizable land).
Architectural plans
Architectural plans: 14 suites, 3 studios, 1 house, natural swimming pool, coworking, restaurant and event space - CRU architects.

Milestones

Winter '20

  1. 🏭 Purchased Factory
  2. πŸ“ Hired CRU architects and drafted plans
  3. πŸ•οΈ Acquired 10 glamping tents
  4. πŸ–ŠοΈ Drafted and signed a lease on the 5ha of land next to the factory, with an option to buy 25ha.
  5. πŸ“œ Created Pink Paper, cost estimate & tokenization model

Spring '21

  1. 🏭 Connected electricity, city water, solar power, cleaned up house & warehouses, setup the glamping tents
  2. 🍳 Temporary industrial kitchen setup
  3. πŸ–₯️ Setup a coworking space, built furniture
  4. πŸ’¦ Initial irrigation of gardens
  5. πŸ—ΊοΈ Topography of land
  6. 🌳 Planted 30+ trees & a first productive garden, removed fences, created compost

Summer '21

  1. ⚑ Built basic infrastructure to host 100+ people: compost toilets, showers, bar, parking spaces
  2. 🍻 Built bar and ran electricity lines throughout lands
  3. πŸ–ŠοΈ Incorporated β€œEnseada Sonhadora S.A.”

Fall '21

  1. 🌳 Covered deforested hill with nitrogen fixing crops & planted 1500 trees
  2. πŸ”₯ Built sauna
  3. 🏠 Insulated the house
  4. πŸ₯³ Hosted first big events: re:build & Primal gatherings
  5. 🌱 Setup a tree nursery from seeds collected in the area
  6. πŸ“ Architectural plans in final phase
  7. πŸ–ŠοΈ Legal structure & DAO model updated

Winter '21

  1. πŸ’€ TDF closed for the winter
  2. 🏠️ Engineering review & prepare 2022 construction roadmap
  3. πŸ–₯️ Develop an MVP of Closer platform (we are building an operating system for land stewardship cmmunities!)
  4. πŸ–ŠοΈ Preparation of DAO launch

Spring '22

  1. 🌳 Planted an additional ~200 trees and started our food forest
  2. πŸ–₯️ Launched Closer MVP with ability to handle bookings & events
  3. 🏠️ Completed insulation of house
  4. πŸ’° Raised seed capital from members
  5. ⚑ Hosted ReFi Spring Portugal, Heart: Magika and other events

Summer '22

  1. 🏠️ Got our architectural plans approved by the municipality, and working on engineering plans
  2. 🏠️ Built a tree house & other land facilities
  3. πŸ’¦ Setup our grey water systems & started our biopool
  4. ⚑ Hosted the Abela Art Faire and had our first artists residents creating art on the lands
  5. πŸ–₯️ Deployed our smart contracts to testnet, allowing for bookings on chain & giving utility to our future $TDF token.

Fall '22 (expected)

  1. 🌳 Plant food forest in collaboration with Marc Leiber and others
  2. πŸ’° Expecting to launch our token sale once the Swiss authorities approve our utility token
  3. πŸ“ Completing engineering plans to submit to municipality
  4. 🏠️ Preparing for construction of the first 6 suites

Summer '23 - Summer '24 (expected)

Go Live!

  1. πŸ–ŠοΈ Execute purchase option on reminder 25Ha of land
  2. πŸ’° Tokens become liquid and can be resold
  3. 🏠️ Construction is completed
  4. 🏠️ Members can check in using their tokens directly